Project Overview

In 2004 a major refurbishment of the building, exhibits and life support systems commenced.  AAT were engaged to implement a complete redesign to the existing life support system on 2x one million litre tanks. Whilst still in operation AAT decommissioned the gravity sand filters and replaced with vertical bed pressurised sand filters saving a huge amount of floor area. These improvements allowed for the addition of a new 300,000 litre exhibit, Stingray Bay as well as the room needed for the exhibit LSS system. The new system was fit with an impressive electronic monitoring, control and reporting automation systems.

AAT also replaced the ocean water intake from the Aquarium to sea access.

Client Kelly Tarlton’s Aquarium

Time Frame 2004 to 2005

Team On-Site 12 AAT personnel

Project LSS Re-design, Stingray Bay & LSS, Replace Ocean Water Intake

world map
Auckland, New Zealand
Sting Ray Bay | Kelly Tarlton’s Aquarium
Sting Ray Bay | Kelly Tarlton’s Aquarium
Life Support System | Kelly Tarlton’s Aquarium

Scope of Works

BUILD PHASE
Construct & Install Services
Acrylic Installation
– Panels and Windows
– Tunnels
Fibre Reinforced Polymer Tanks
– Exhibit tanks
– Processing tanks
– Quarantine tanks
Rockwork & Theming
– Base rock construction
– Corals
– Theming
Waterproofing
Life Support System Services
– Foam Fractionators
– Sand Filters
– Bag Filters
– Bio Filters
– UV Filter
– Ozone Generators
– Digital Control Systems
OPERATE PHASE
Commissioning, Training & Handover Service
Repair, Restoration & Refurbishment Service