Mardan Palace Hotel & Resort Swim Reef, Antalya, Turkey.

AAT provides LSS equipment and helps build rockwork and corals in a large and luxurious swim reef.

Project Overview

Opened on 23rd May 2009, the Mardin Palace Hotel (now owned by Titanic Hotels and known as the Titanic Mardin Palace Hotel) is positioned as a one-of-a-kind resort with “5-star sophistication, award-winning service and a picture-perfect location”.

Mardan Palace Hotel Swim Reef2

The sumptuous destination – which has been called Europe’s and the Mediterranean’s most luxury resort – incorporated a huge 1.7 million litre Swim Reef formerly known as the Safisa Swim Reef.

Mardan Palace Hotel Antalya Turkey02

This amazing man-made aquatic adventure enabled guests to swim, feed and snorkel with an array of marine species. The reefs and pools were home to rays, over 3,000 tropical fish, featured deep sections of coral and an enclosed shark tank.

AAT provided LSS design and engineering services, LSS equipment, waterproofing services, and helped construct about 1,000 square meters of simulated rockwork and coral features.

Özlü, Titanic Mardan Palace, Aksu/Antalya, Turkey

Client
ICM

Time Frame
2007 to 2008

Team On-Site
25 AAT personnel

System Type
Natural seawater system drawing water from Mediterranean Sea

Project
1,000 sq meters of rockwork, artifical corals & LSS equipment

An exceptional portfolio of in-house capabilities.

  • A seamless start-to-finish service.
  • More than project coordinators - we are the lead supplier of equipment and services too.
  • We offer productive collaboration between multi-disciplinary teams and resources.
  • Our logistical and project management track record provides total peace-of-mind.
  • A high-level of internal delivery means excellent control over quality assurance.
  • System-thinking from design to execution, for a cost-efficient and durable aquarium that is easy to operate and spectacular to see.

Are you considering creating a new aquarium?

Book a consultation
Phase 1

Design

The first phase addresses feasibility, budgeting, concept development, creative themes, visitor-experience design and journey-mapping, detailed engineering and project planning.

Phase 2

Build

The second phase focuses on acrylic manufacturing, construction and installation, the supply and installation of life support systems, waterproofing, lighting, filling and stocking the tanks.

Phase 3

Operate

The third phase includes handing the aquarium over to its owners and operators. Also included this phase, for older aquariums, are services relating to refurbishment and renovation.

Related Projects

Public Aquarium

Den Bla Planet, Copenhagen, Denmark

Advanced Aquarium Technologies leads the design and construction of the National Aquarium of Denmark - Northern Europe's largest aquarium....

Public Aquarium

Cube Oceanarium, Chengdu, China

Advanced Aquarium Technologies (AAT) plays a leading role in the delivery of a world-record-setting public aquarium exhibiting 10,000 aquatic creatures....

Public Aquarium

Oman Aquarium, Oman, Muscat.

Advanced Aquarium Technologies (AAT) delivers the Middle East’s largest themed aquarium, home to 30,000 animals in over 55 exhibits....

Public Aquarium

Ocean Park Grand Aquarium LSS, Hong Kong, China

Advanced Aquarium Technology supplies Life Support Systems and Waterproofing Services to leading Asian theme park aquarium....

Public Aquarium

Sea World, Gold Coast, Australia.

One of the world’s biggest lagoon system for sharks kept sparkly clean and healthy by enormous AAT Life Support System....